Roman Room Thermae Spa

Looking for the complete solution for your project?

What we do

Who We Are

Complete Solutions Europe Ltd was formed out of the group that built over 100 Fitness First gyms between 1995 and 2000.

When Fitness First gym building programme finished, CSE was formed in 2003 to offer the knowledge and experience gained in the construction and fit outs to clients in the domestic house and leisure sector.

CSE from 2003 has built Fitness gyms for Energie and Anytime.  Health spas have been built in Marriott Hotels, Crown Plazza Hotels, Nuffield Fitness Group, Bannatynes and Center Parcs.

Prestigious sites such as Ribby Hall, Bath Thermae Spa, Trinity Square, Swinton Park.

In addition to traditional construction methods are offered.  CSE offer a modular house system provided by WWL Houses of Riga in Latvia.  The cost savings in construction time are significant compared with traditional build.  This sector falls into the classification of timber frame which in the UK is still treated with suspicion given the basic system that were offered.

The WWL product is 5 layered insulated waterproof breathable that can be easily adjusted to offer a passive house product.

Airtight and providing significant energy cost savings see wwl webpage.

Creating fitness gyms and wellness spas necessitates waterproofing solutions to be installed.

CSE are an accredited installer of the Triton Waterproof membrane system.

Building fitness gyms and spas even refurbishing old installation required the ability to work to tight timetables to reduce the down time for the client.

Our Clients

  • Fitness First
  • David Lloyd
  • holmes-place
  • Dale Sauna
  • DeVere Hotels
  • Thermae Bath Spa